Erection of all interfaces with System and Communication Network.
Remote Terminal Unit (RTU - IEC 104V2 Protocol)
- Engineering Data Preparation & Technical Drawings
- Site Survey, Panel Assembling & Panel Erection
- Cable Laying; Power / Control Cables Laying & AI Tagging.
- Installations
- Hardwiring & Termination
- Configurations
- Testing
Field Remote Terminal Unit (FRTU - IEC 101 & 104V2 Protocol)
Installation of FRTU, Testing and Commissioning of FRTU are carried over at field. Integrating FRTU with RMU in order to retrieve data at Control Centre. The process involves:
- Engineering Data Preparations, Drawings & Site Survey Reports
- Panel Assembling
- Civil works: Basement, Foundations & Pipe Fixing
- Panel erection
- IED, DCPS & Monitoring Units Mounting and Connecting
- Battery fixing & Connections
- DI, DO termination & Communication Cable Connection
- RMU & Sectionalizer Panel Integration
- Testing and Commissioning;