Erection of all interfaces with System and Communication Network.


Remote Terminal Unit (RTU - IEC 104V2 Protocol)

  • Engineering Data Preparation & Technical Drawings
  • Site Survey, Panel Assembling & Panel Erection
  • Cable Laying; Power / Control Cables Laying & AI Tagging.
  • Installations
  • Hardwiring & Termination
  • Configurations
  • Testing

Field Remote Terminal Unit (FRTU - IEC 101 & 104V2 Protocol)

Installation of FRTU, Testing and Commissioning of FRTU are carried over at field. Integrating FRTU with RMU in order to retrieve data at Control Centre. The process involves:

  • Engineering Data Preparations, Drawings & Site Survey Reports
  • Panel Assembling
  • Civil works: Basement, Foundations & Pipe Fixing
  • Panel erection
  • IED, DCPS & Monitoring Units Mounting and Connecting
  • Battery fixing & Connections
  • DI, DO termination & Communication Cable Connection
  • RMU & Sectionalizer Panel Integration
  • Testing and Commissioning;